1/27/2005
Station began recording data (signature 5026). (Finney)
Data lost from 1:17 pm on 2/2/2005 through 4:03 pm on 2/7/2005 due to lack of communications.
2/15/2005
Datalogger program modified (signature 1676). (Finney)
4/9/2005
Visual inspection; photographs; two guy wires loose; "bare" soil plot covered with grass (White)
Loss of wind data from 1:30 pm on 8/29/2005 through 10:38 pm on 9/16/2005 due to hurricane damage (cable leads were pulled out of datalogger). South guy wire was broken and NW base plate bolt was compromised, resulting in northward tilt of tower. In mid-September, temporary repairs brought the tower back within a few degrees of plumb.
Data lost from 4:40 pm on 9/11/2005 through 10:38 pm on 9/16/2005 due to communications failure.
12/12/2005 (10:00 am to 1:30 pm)
Visual inspection and documentation; bare soil plot was mostly dead, but not bare; soil sterilant was applied; key to gate and enclosure was obtained. (White)
Data lost from 5/7/2006 to 5/21/2006 due to failure of Lantronix after lightning strike.
6/6/2006 (9:30 am to 12:30 pm)
Lantronix replaced and configured; visual inspection; bare soil plot was mostly dead; small amount of live growth removal.