10/?/2004
Station was installed, photographs, digital video (Finney, White, Mahecha, Matlack)
12/23/2004
Station began recording data (signature 2532) at 8:18. (Finney)
1/25/2005
Updated datalogger program (signature 2168) to include IRTS, 10 HMP45C (temp., RH), and vertical wind (data lost between 16:39 and 16:50); Updated datalogger program (signature 321.3) to correct calculations of IRTS and 10 m temperature (temperature and RH data affected between 17:07 and 17:09; data lost between 17:16 and 17:18). (Finney)
8/5/2005
Visual inspection, wiring documented, photographs (White)
10/21/2005
Visual inspection, soil thermocouples installed in bare plot (between 18:34 and 18:55), SK-13 applied to bare plot, vertical propeller removed (at 14:35), desiccant changed, putty applied to second enclosure opening, photographs (White)
10/28/2005
New datalogger program installed (signature 1993) to set vertical wind to "0" and store 50 cm and 100 cm soil temperatures in place of standard deviations of wind speed (data lost between 14:52 and 15:37; summary data lost up to 18:00). (White)
11/1/2005
New datalogger program installed (signature 2042) to set missing vertical wind to -6999 (data lost between 16:20 and 16:23; precip accumulation was reset); New datalogger program installed (signature 3960) (around 18:50; only affected summary quantities?) (White)
12/15/2005
Top several inches of bare soil plot were dug up by animal, completely exposing 5 cm soil temperature sensor to direct sunlight. 10 cm soil temperatures probably also affected.
3/4/2006
Communications outage began at about 2100. (White)
4/4/2006
Soil sensors were reburied around 13:40. Yagi antenna at Calhoun City High School moved from ground level table to roof level at southwest corner of building. Diagnosed communications interruption due to duplicate IP conflict, apparently due to having been mistakenly switched to DHCP on March 4. (White)
6/14/2006 (8:15 am to 1:00 pm)
Vitel HydraProbes and multiplexer installed; minor maintenance of bare soil plot and application of
soil sterilant; photographs taken. (White)
7/19/2006
Visual inspection; minor bare soil plot maintenance; key exchanged. (White)
8/19/2006
Vitels and multiplexer rewired and new program installed; minor maintenance of bare soil plot. (White)