12/12/2005 (2:30 to 4:30 pm)
Station initial inspection and documentation; soil sensors, quantum sensor, IRTS and GPS receiver not installed; multiplexer not connected; vertical wind anemometer and second barometer on station; station location modified from agreement to position within 50 m of mature treeline; concerns about non-standard wiring of Wind Monitors and position of raingauges; raingauges calibrated for 300 mm/hr (TB3: 0.80 inch on TRD, 20 mm on CR23X); network connection and radios seem to be functioning; program signature 2914. (White)
6/6/2006 (or 6/7?) (2:00 to 8:30 pm)
Lantronix and radio plugged back in to power; Lantronix reconfigured; data downloaded; bare soil plot prepared
and soil thermocouples installed; IRTS wired to datalogger. (White)
6/7/2006 3:46 pm to 6/8/2006 5:24 pm
Data lost.
6/23/2006
Vitel HydraProbes and multiplexer installed.(White)